Dewa on track with studies for Hatta power plantDubai Electricity and Water Authority (Dewa) has completed 14 per cent of the engineering studies for the hydroelectric power station that will make use of the water stored in the Hatta Dam. This is part of a consultancy contract, Moreā¦ |